United States › Grid › Interconnection queues › Virginia

BATTERY STORAGE · PJM

Brunswick Battery Storage

Brunswick Battery Storage is a 75.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Brunswick County, Virginia, connecting to Dominion.

Queue statusIn planning
  1. PlanningQueued Sep 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jul 2031 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AG1-153
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
Connection point (POI)
Heritage 500 kV
Location
Brunswick County, Virginia
Technology
Battery: 75.0 MW
Total requested
75.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Interim Study
Queue status
Active
Entered queue
10 September 2020
Proposed online date
July 2031

Location

Marker shows the centre of Brunswick County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Brunswick County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem