United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMBattery storage project AG2-571, Brunswick County
Battery storage project AG2-571, Brunswick County is a 100 MW battery storage request in interconnection study in the PJM interconnection queue, in Brunswick County, Virginia, connecting to Dominion.
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AG2-571
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Zeus Storage, LLC
- Connection point (POI)
- Heritage - Wake 500 kV
- Location
- Brunswick County, Virginia
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 27 March 2025
- Proposed online date
- March 2024
Location
Marker shows the centre of Brunswick County; the queue data does not give exact sites.
Other requests in Brunswick County
- Solar project AG2-570, Brunswick CountySolar · 400 MW · in study
- Honeybee Solar, LLCSolar · 301 MW · in study
- Solar project AG2-069, Brunswick CountySolar · 150 MW · in study
- Solar project AG2-581, Brunswick CountySolar · 150 MW · in study
- Battery storage project AH2-291, Brunswick CountyBattery storage · 150 MW · in study
- Solar project AG2-068, Brunswick CountySolar · 100 MW · in study
- Solar + storage project AI2-004, Brunswick CountySolar + storage · 80.0 MW · in study
- Brunswick Battery StorageBattery storage · 75.0 MW · in study
- Solar project AH2-080, Brunswick CountySolar · 52.7 MW · in study
- Brunswick Combined Cycle Power StationGas · 1,526 MW · built
- King - QueenOther · 10.0 MW · built
- Gas project Y2-097, Brunswick CountyGas · 1,551 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem