Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Piney Creek Solar Solar |
80.0 MW | |
| Foxglove Solar Solar |
75.0 MW | |
| Wythe County Solar Project Solar |
75.0 MW | |
| Bedford Solar Center Solar |
70.0 MW | |
| Waverly Solar Solar |
68.0 MW | |
| Foxhound Solar Solar |
64.2 MW | |
| Carvers Creek Solar Solar |
50.0 MW | |
| Powells Creek Solar Solar |
50.0 MW | |
| Alton Post Office Solar Solar |
45.9 MW | |
| Warren County Power Station Gas |
20.0 MW | |
| Halifax County Solar Solar |
20.0 MW | |
| Maplewood Solar Solar |
20.0 MW | |
| Powells Creek Solar Solar |
20.0 MW | |
| Gloucester Solar Solar |
19.8 MW | |
| Ladysmith Combustion Turbines Unit 1 Gas |
19.0 MW | |
| Ladysmith Combustion Turbines Unit 2 Gas |
19.0 MW | |
| Briel Farm Solar Solar |
18.8 MW | |
| Puller Solar Solar |
15.0 MW | |
| TWE Myrtle Solar Project Solar |
15.0 MW | |
| Chesterfield Unit 5 Coal |
14.0 MW | |
| Gardy's Mill Solar Solar |
10.8 MW | |
| Cushaw Hydropower Station Hydro |
5.5 MW | |
| Briel Farm Solar Solar |
1.3 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)