United States › Grid › Interconnection queues › Virginia
HYDRO · PJMCushaw Hydropower Station
Cushaw Hydropower Station is a 5.5 MW hydro request built and operating in the PJM interconnection queue, in Bedford County, Virginia, connecting to Dominion.
Request details
- Queue ID
- AD1-084
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Cushaw 115 kV
- Location
- Bedford County, Virginia
- Technology
- Hydro: 5.5 MW
- Total requested
- 5.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 12 September 2017
- Proposed online date
- January 2019
- Came online
- November 2018
Location
Marker shows the centre of Bedford County; the queue data does not give exact sites.
Other requests in Bedford County
- Solar + storage project AH1-368, Bedford CountySolar + storage · 125 MW · withdrawn
- Solar project AE1-064, Bedford CountySolar · 102 MW · withdrawn
- Solar project AH1-381, Bedford CountySolar · 99.5 MW · withdrawn
- Solar project AE1-130, Bedford CountySolar · 83.0 MW · withdrawn
- Battery storage project AG2-311, Bedford CountyBattery storage · 75.0 MW · withdrawn
- Solar project AG2-066, Bedford CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem