Battery storage project AG2-311, Bedford County

Battery storage project AG2-311, Bedford County is a 75.0 MW battery storage request withdrawn in the PJM interconnection queue, in Bedford County, Virginia, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-311
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Smith Mountain Storage, LLC
Connection point (POI)
Smith Mountain 138 kV
Location
Bedford County, Virginia
Technology
Battery: 75.0 MW
Total requested
75.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
25 February 2025
Proposed online date
December 2023
Withdrawn
December 2025

Location

Marker shows the centre of Bedford County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Bedford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem