BATTERY STORAGE Β· PJMBattery storage project AG2-311, Bedford County
Battery storage project AG2-311, Bedford County is a 75.0 MW battery storage request withdrawn in the PJM interconnection queue, in Bedford County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-311
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Developer
- Smith Mountain Storage, LLC
- Connection point (POI)
- Smith Mountain 138 kV
- Location
- Bedford County, Virginia
- Technology
- Battery: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 25 February 2025
- Proposed online date
- December 2023
- Withdrawn
- December 2025
Location
Marker shows the centre of Bedford County; the queue data does not give exact sites.
Other requests in Bedford County
- Cushaw Hydropower StationHydro Β· 5.5 MW Β· built
- Solar + storage project AH1-368, Bedford CountySolar + storage Β· 125 MW Β· withdrawn
- Solar project AE1-064, Bedford CountySolar Β· 102 MW Β· withdrawn
- Solar project AH1-381, Bedford CountySolar Β· 99.5 MW Β· withdrawn
- Solar project AE1-130, Bedford CountySolar Β· 83.0 MW Β· withdrawn
- Solar project AG2-066, Bedford CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem