United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AH1-381, Bedford County
Solar project AH1-381, Bedford County is a 99.5 MW solar request withdrawn in the PJM interconnection queue, in Bedford County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-381
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Lone Gum - Rockcastle 138 kV
- Location
- Bedford County, Virginia
- Technology
- Solar: 99.5 MW
- Total requested
- 99.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2021
- Proposed online date
- May 2025
- Withdrawn
- December 2024
Location
Marker shows the centre of Bedford County; the queue data does not give exact sites.
Other requests in Bedford County
- Cushaw Hydropower StationHydro Β· 5.5 MW Β· built
- Solar + storage project AH1-368, Bedford CountySolar + storage Β· 125 MW Β· withdrawn
- Solar project AE1-064, Bedford CountySolar Β· 102 MW Β· withdrawn
- Solar project AE1-130, Bedford CountySolar Β· 83.0 MW Β· withdrawn
- Battery storage project AG2-311, Bedford CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar project AG2-066, Bedford CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem