Withdrawn queue requests in Vermont (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown13418 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn13418 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar
Solar
196 MWWithdrawn / abandoned Franklin, VTISO-NE Sep 2015target 2017
Solar
Solar
20.0 MWWithdrawn / abandoned Orleans, VTISO-NE Aug 2015target 2017
solar
Solar
20.0 MWWithdrawn / abandoned Franklin, VTISO-NE Aug 2015target 2016
Solar
Solar
20.0 MWWithdrawn / abandoned Orange, VTISO-NE Aug 2015target 2016
solar
Solar
20.0 MWWithdrawn / abandoned Windsor, VTISO-NE Aug 2015target 2016
Solar
Solar
20.0 MWWithdrawn / abandoned Franklin, VTISO-NE Aug 2015target 2017
Solar
Solar
20.0 MWWithdrawn / abandoned Rutland, VTISO-NE Sep 2015target 2016
Solar
Solar
19.9 MWWithdrawn / abandoned Rutland, VTISO-NE Sep 2015target 2016
Solar
Solar
19.9 MWWithdrawn / abandoned Franklin, VTISO-NE Jun 2015target 2016
Solar
Solar
19.9 MWWithdrawn / abandoned Windsor, VTISO-NE Jun 2015target 2016
Solar
Solar
19.9 MWWithdrawn / abandoned Franklin, VTISO-NE Sep 2015target 2016
wind
Onshore wind
17.4 MWWithdrawn / abandoned Franklin, VTISO-NE Feb 2015target 2016
Wind
Onshore wind
5.0 MWWithdrawn / abandoned Orleans, VTISO-NE Feb 2015target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)