United States βΊ Grid βΊ Interconnection queues βΊ Vermont
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Vermont
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| VT Yankee Nuclear Power Station Upgrade7 Nuclear |
642 MW | |
| Kingdom Community Wind Onshore wind |
61.5 MW | |
| Sheffield Wind Project Onshore wind |
40.0 MW | |
| Vernon Repowering Hydro |
32.0 MW | |
| Deerfield Wind Project Onshore wind |
30.0 MW | |
| VPPSA Swanton Gas Turbine #1 Gas |
21.0 MW | |
| Coolidge Solar Solar |
19.9 MW | |
| Georgia Mountain Community Wind Onshore wind |
10.0 MW | |
| GMP Essex Diesel Other |
8.0 MW | |
| Moretown Landfill Other |
4.8 MW | |
| Proctor Hydroelectric Station Uprate Hydro |
3.2 MW | |
| Kingdom Community Wind Increase (see Q311) Onshore wind |
3.1 MW | |
| Vernon Station Incremental Capacity Increase Hydro |
2.9 MW | |
| Huntington Falls 2017 Upgrades Hydro |
1.6 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)