United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Utah (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown271,818 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn271,818 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

27 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 343, Millard County
Onshore wind
398 MWWithdrawn / abandoned Millard, UTWest Jun 2010target 2013
Gas project 359, Salt Lake County
Gas
275 MWWithdrawn / abandoned Salt Lake, UTWest Nov 2010target 2014
Onshore wind project 330, Juab County
Onshore wind
200 MWWithdrawn / abandoned Juab, UTWest Apr 2010target 2014
Onshore wind project Q16, Iron County
Onshore wind Β· Intermountain Power Agency
200 MWWithdrawn / abandoned Iron, UTWest Oct 2010target 2013
Hydro project 337, Washington County
Hydro
174 MWWithdrawn / abandoned Washington, UTWest Jun 2010target 2005
Solar project 367, Iron County
Solar
172 MWWithdrawn / abandoned Iron, UTWest Dec 2010target 2014
Gas project 336, Utah County
Gas
71.0 MWWithdrawn / abandoned Utah, UTWest Jun 2010target 2015
Geothermal project 321, Beaver County
Geothermal
50.0 MWWithdrawn / abandoned Beaver, UTWest Feb 2010target 2016
Onshore wind project G0417, Box Elder County
Onshore wind
50.0 MWWithdrawn / abandoned Box Elder, UTWest Mar 2010target 2013
Hydro project 338, Washington County
Hydro
33.2 MWWithdrawn / abandoned Washington, UTWest Jun 2010target 2005
Geothermal project 326-A, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Geothermal project 326-E, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Geothermal project 326-C, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Geothermal project 326-B, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Geothermal project 326-D, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Geothermal project 326-F, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Solar project 317, Weber County
Solar Β· Lakeview Cogeneration, LLC
19.9 MWWithdrawn / abandoned Weber, UTWest Feb 2010target 2012
Onshore wind project 345-A, Washington County
Onshore wind
14.0 MWWithdrawn / abandoned Washington, UTWest Jul 2010target 2010
Gas project 347, Washington County
Gas Β· AG Hydro, LLC
7.5 MWWithdrawn / abandoned Washington, UTWest Jul 2010target 2010
Hydro project 340, Washington County
Hydro
5.2 MWWithdrawn / abandoned Washington, UTWest Jun 2010
Solar project 326-G, Beaver County
Solar
5.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Solar project 342, Beaver County
Solar
5.0 MWWithdrawn / abandoned Beaver, UTWest Jun 2010target 2011
Hydro project 345-B, Washington County
Hydro
3.3 MWWithdrawn / abandoned Washington, UTWest Jul 2010target 2010
Solar project 320, San Juan County
Solar
3.0 MWWithdrawn / abandoned San Juan, UTWest Feb 2010
Other project 332, Beaver County
Other Β· PacifiCorp Energy
2.8 MWWithdrawn / abandoned Beaver, UTWest Apr 2010target 2011
Hydro project 339, Washington County
Hydro
2.0 MWWithdrawn / abandoned Washington, UTWest Jun 2010target 2020
Onshore wind project 334, Beaver County
Onshore wind
0.5 MWWithdrawn / abandoned Beaver, UTWest May 2010target 2010

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)