Completed queue projects in Texas (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown173,333 MW
Active in queue3,201 MW14 requests
Agreement signed1,107 MW5 requests
Withdrawn246,944 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

17 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J472, Montgomery County
Gas
1,045 MWOperating Montgomery, TXMISO Sep 20152020
Las Majadas Wind
Onshore wind Β· EDF Renewable Energy
273 MWOperating Willacy, TXERCOT Oct 20152023
Texas Solar Nova
Solar Β· TEXAS SOLAR NOVA 1, LLC
254 MWOperating Kent, TXERCOT Nov 20152024
Reloj Del Sol Wind
Onshore wind Β· EDP Renewables
209 MWOperating Zapata, TXERCOT Mar 20152022
Karankawa Wind
Onshore wind Β· Avangrid
207 MWOperating San Patricio, TXERCOT Oct 20152019
Venado Wind
Onshore wind Β· Las Lomas Wind Energy, LLC
202 MWOperating Starr, TXERCOT May 20152021
Waymark Solar
Solar Β· 174 Power Global
182 MWOperating Pecos, TXERCOT May 20152018
RTS 2 Wind
Onshore wind Β· Heart of Texas Wind, LLC
180 MWOperating Mcculloch, TXERCOT Nov 20152021
Peyton Creek Wind
Onshore wind Β· RWE Renewables Development, LLC
151 MWOperating Matagorda, TXERCOT Nov 20152020
Onshore wind project GEN-2015-014, Cochran County
Onshore wind
150 MWOperating Cochran, TXSPP Mar 20152018
Cactus Flats Wind
Onshore wind Β· Southern Power Company
148 MWOperating Concho, TXERCOT Feb 20152022
East Blackland Solar
Solar + storage Β· East Blackland Holdings LLC
144 MWOperating Travis, TXERCOT Apr 20152021
Hudson (Ineos/Brazoria)
Gas Β· Ineos
96.0 MWOperating Brazoria, TXERCOT Jan 20152020
Gas project J486, Grimes County
Gas
51.0 MWOperating Grimes, TXMISO Oct 20152000
Espiritu Wind
Onshore wind Β· Acciona
25.2 MWOperating Cameron, TXERCOT May 20152021
Nasa
Gas Β· NASA
12.0 MWOperating Harris, TXERCOT Mar 20152022
Gas project GEN-2015-041, Hale County
Gas
5.0 MWOperating Hale, TXSPP Sep 20152019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)