United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in South Dakota (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project J3941, Deuel County Gas |
1,144 MW | In study |
| Solar project J3964, Brookings County Solar |
490 MW | In study |
| Solar project J3963, Brookings County Solar |
490 MW | In study |
| Gas project E0034, Brookings County Gas Β· Basin Electric Power Cooperative |
265 MW | In study |
| Battery storage project J4153, Grant County Battery storage |
250 MW | In study |
| Onshore wind project GEN-2024-285, Clark County Onshore wind |
250 MW | In study |
| Battery storage project J4081, Grant County Battery storage |
250 MW | In study |
| Solar project GEN-2024-283, Meade County Solar |
150 MW | In study |
| Solar project GEN-2024-282, Meade County Solar |
150 MW | In study |
| Gas project ERAS-2025-035, Brown County Gas |
138 MW | In study |
| Onshore wind project GEN-2025-GR4, Aurora County Onshore wind |
10.8 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)