ONSHORE WIND · SPPOnshore wind project GEN-2025-GR4, Aurora County
Onshore wind project GEN-2025-GR4, Aurora County is a 10.8 MW onshore wind request in interconnection study in the SPP interconnection queue, in Aurora County, South Dakota, connecting to WAPA.
- PlanningQueued Oct 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2025-GR4
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Wessington Springs
- Location
- Aurora County, South Dakota
- Technology
- Wind: 10.8 MW
- Total requested
- 10.8 MW
- Service type
- NRIS and ERIS
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 6 October 2025
Location
Marker shows the centre of Aurora County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Aurora County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem