United States › Grid › Interconnection queues › South Dakota
ONSHORE WIND · WESTOnshore wind project 208, Aurora County
Onshore wind project 208, Aurora County is a 20.0 MW onshore wind request built and operating in the West interconnection queue, in Aurora County, South Dakota, connecting to NorthWestern Energy.
Request details
- Queue ID
- 208
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- White Lake Substation, SD
- Location
- Aurora County, South Dakota
- Technology
- Wind: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- System Impact Study System Impact Study-Revised Facilities Study
- Queue status
- Operational
- Entered queue
- 23 July 2015
- Proposed online date
- December 2016
- Came online
- December 2016
Location
Marker shows the centre of Aurora County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Aurora County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem