United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in South Dakota (2024 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Wind + storage project J3468, Day County Wind + storage |
300 MW | In study |
| Solar + storage project GEN-2024-035, Brown County Solar + storage |
270 MW | In study |
| Onshore wind project J3420, Mcpherson County Onshore wind |
200 MW | In study |
| Onshore wind project J3428, Mcpherson County Onshore wind |
200 MW | In study |
| Other project J3400, Deuel County Other |
142 MW | In study |
| Onshore wind project J3546, Lincoln County Onshore wind |
120 MW | In study |
| Gas project BHBE G25, Pennington County Gas Β· Black Hills Power Inc. |
115 MW | In study |
| Gas project 456, Brown County Gas |
5.0 MW | In study |
| Gas project 462, Beadle County Gas |
2.0 MW | In study |
| Gas project 463, Beadle County Gas |
0.5 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)5 Β· 962 MW
- SPP (Southwest Power Pool)1 Β· 270 MW
- West (non-ISO utilities)4 Β· 123 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)