United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Pennsylvania (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown14722 MW
Active in queue390 MW7 requests
Agreement signed59.8 MW3 requests
Withdrawn494,265 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

14 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Great Cove Solar II
Solar
150 MWOperating Franklin, PAPJM Sep 20182024
Aspen Road Solar
Solar
100 MWOperating Franklin, PAPJM Jul 20182025
Helix Ironwood Facility
Gas
89.8 MWOperating Lebanon, PAPJM Mar 20182022
Sandy Ridge
Onshore wind
85.4 MWOperating Centre, PAPJM Mar 20182023
South Bend Generating Station
Gas
68.1 MWOperating Armstrong, PAPJM Mar 20182022
Springdale
Gas
50.4 MWOperating Allegheny, PAPJM Mar 20182023
Ontelaunee Power Generating Plant
Gas
38.9 MWOperating Berks, PAPJM Jan 20182019
Jericho
Gas
29.0 MWOperating Delaware, PAPJM Oct 20182020
Lyons Solar
Solar
20.0 MWOperating Berks, PAPJM Mar 20182023
Cottontail Solar 2
Solar
20.0 MWOperating York, PAPJM Mar 20182024
Cottontail Solar 1
Solar
20.0 MWOperating York, PAPJM Sep 20182024
Cottontail Solar 8
Solar
20.0 MWOperating York, PAPJM Sep 20182024
Clarion Boards
Gas
18.0 MWOperating Clarion, PAPJM Sep 20182023
Chambersburg Energy, LLC
Gas
12.0 MWOperating Franklin, PAPJM Mar 20182020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)