United States › Grid › Interconnection queues › Pennsylvania

GAS · PJM

Helix Ironwood Facility

Helix Ironwood Facility is a 89.8 MW gas request built and operating in the PJM interconnection queue, in Lebanon County, Pennsylvania, connecting to ME.

Queue statusOperating
  1. PlanningQueued Mar 2018 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingApr 2022 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AD2-166
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ME
Connection point (POI)
Ironwood 230kV
Location
Lebanon County, Pennsylvania
Technology
Gas: 89.8 MW
Total requested
89.8 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
27 March 2018
Proposed online date
April 2022
Came online
April 2022

Location

Marker shows the centre of Lebanon County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Lebanon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem