United States › Grid › Interconnection queues › Pennsylvania

BATTERY STORAGE · PJM

Ironwood Battery Storage

Ironwood Battery Storage is a 250 MW battery storage request withdrawn in the PJM interconnection queue, in Lebanon County, Pennsylvania, connecting to ME.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-561
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ME
Developer
Helix Ironwood, LLC
Connection point (POI)
Ironwood 230kV
Location
Lebanon County, Pennsylvania
Technology
Battery: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
June 2025
Withdrawn
June 2025

Location

Marker shows the centre of Lebanon County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Lebanon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem