Sandy Ridge

Sandy Ridge is a 85.4 MW onshore wind request built and operating in the PJM interconnection queue, in Centre County, Pennsylvania, connecting to PENELEC.

Queue statusOperating
  1. PlanningQueued Mar 2018 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingSep 2023 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AD2-133
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Eagle Valley 115kV
Location
Centre County, Pennsylvania
Technology
Wind: 85.4 MW
Total requested
85.4 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
25 March 2018
Proposed online date
July 2023
Came online
September 2023

Location

Marker shows the centre of Centre County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Centre County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem