United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Oklahoma (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown102,048 MW
Active in queue1,255 MW7 requests
Agreement signed402 MW3 requests
Withdrawn102,048 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project GEN-2020-085, Carter County
Solar
500 MWWithdrawn / abandoned Carter, OKSPP Apr 2020target 2026
Solar + storage project GEN-2020-009, Cotton County
Solar + storage
300 MWWithdrawn / abandoned Cotton, OKSPP Apr 20202025
Battery storage project GEN-2020-023, Garfield County
Battery storage
202 MWWithdrawn / abandoned Garfield, OKSPP Apr 20202025
Onshore wind project GEN-2020-016, Tillman County
Onshore wind
202 MWWithdrawn / abandoned Tillman, OKSPP Apr 2020target 2026
Battery storage project GEN-2020-SR3, Johnston County
Battery storage
200 MWWithdrawn / abandoned Johnston, OKSPP Aug 20202023
Battery storage project GEN-2020-074, Carter County
Battery storage
200 MWWithdrawn / abandoned Carter, OKSPP Apr 2020target 2026
Battery storage project GEN-2020-075, Comanche County
Battery storage
200 MWWithdrawn / abandoned Comanche, OKSPP Apr 2020target 2026
Solar project GEN-2020-015, Johnston County
Solar
104 MWWithdrawn / abandoned Johnston, OKSPP Apr 2020target 2026
Battery storage project GEN-2021-002, Blaine County
Battery storage
100 MWWithdrawn / abandoned Blaine, OKSPP Dec 2020target 2027
Battery storage project GEN-2020-SR1, Beckham County
Battery storage
40.0 MWWithdrawn / abandoned Beckham, OKSPP Aug 20202024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)