United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2020-009, Cotton County
Solar + storage project GEN-2020-009, Cotton County is a 300 MW solar + storage request withdrawn in the SPP interconnection queue, in Cotton County, Oklahoma, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2020-009
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Lawton East Side to Oklaunion 345kV
- Location
- Cotton County, Oklahoma
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 8 April 2020
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- April 2025
Location
Marker shows the centre of Cotton County; the queue data does not give exact sites.
Other requests in Cotton County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem