United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR Β· SPPSolar project GEN-2020-085, Carter County
Solar project GEN-2020-085, Carter County is a 500 MW solar request withdrawn in the SPP interconnection queue, in Carter County, Oklahoma, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2020-085
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Lawton to Sunnyside 345 kV Line
- Location
- Carter County, Oklahoma
- Technology
- Solar: 500 MW
- Total requested
- 500 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 23 April 2020
- Proposed online date
- October 2026
- Withdrawn
- October 2025
Location
Marker shows the centre of Carter County; the queue data does not give exact sites.
Other requests in Carter County
- Battery storage project GEN-2024-242, Carter CountyBattery storage Β· 250 MW Β· in study
- Solar + storage project GEN-2024-337, Carter CountySolar + storage Β· 250 MW Β· in study
- Onshore wind project GEN-2017-027, Carter CountyOnshore wind Β· 140 MW Β· built
- Onshore wind project GEN-2012-004, Carter CountyOnshore wind Β· 40.8 MW Β· built
- Solar + storage project GEN-2021-004, Carter CountySolar + storage Β· 250 MW Β· withdrawn
- Solar project GEN-2017-166, Carter CountySolar Β· 250 MW Β· withdrawn
- Battery storage project GEN-2020-074, Carter CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project GEN-2022-042, Carter CountySolar Β· 174 MW Β· withdrawn
- Onshore wind project GEN-2010-019, Carter CountyOnshore wind Β· 52.2 MW Β· withdrawn
- Battery storage project GEN-2017-167, Carter CountyBattery storage Β· 52.0 MW Β· withdrawn
- Gas project GEN-2008-056S, Carter CountyGas Β· 4.8 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem