πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

BATTERY STORAGE Β· SPP

Battery storage project GEN-2017-167, Carter County

Battery storage project GEN-2017-167, Carter County is a 52.0 MW battery storage request withdrawn in the SPP interconnection queue, in Carter County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2017 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-167
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Sunnyside 345kV
Location
Carter County, Oklahoma
Technology
Battery: 52.0 MW
Total requested
52.0 MW
Service type
NRIS and ERIS
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
29 November 2017
Proposed online date
December 2027
Withdrawn
September 2024

Location

Marker shows the centre of Carter County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Carter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem