BATTERY STORAGE Β· SPP

Battery storage project GEN-2021-002, Blaine County

Battery storage project GEN-2021-002, Blaine County is a 100 MW battery storage request withdrawn in the SPP interconnection queue, in Blaine County, Oklahoma, connecting to WFEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2020 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-002
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WFEC
Connection point (POI)
138kV Okeene Switch Station
Location
Blaine County, Oklahoma
Technology
Battery: 100 MW
Total requested
100 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 December 2020
Proposed online date
January 2027
Withdrawn
September 2024

Location

Marker shows the centre of Blaine County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Blaine County