BATTERY STORAGE Β· SPPBattery storage project GEN-2021-002, Blaine County
Battery storage project GEN-2021-002, Blaine County is a 100 MW battery storage request withdrawn in the SPP interconnection queue, in Blaine County, Oklahoma, connecting to WFEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandonedSep 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-002
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- 138kV Okeene Switch Station
- Location
- Blaine County, Oklahoma
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 December 2020
- Proposed online date
- January 2027
- Withdrawn
- September 2024
Location
Marker shows the centre of Blaine County; the queue data does not give exact sites.
Other requests in Blaine County
- Battery storage project GEN-2023-161, Blaine CountyBattery storage Β· 74.9 MW Β· in study
- Onshore wind project GEN-2007-044, Blaine CountyOnshore wind Β· 299 MW Β· built
- Onshore wind project GEN-2010-028, Blaine CountyOnshore wind Β· 335 MW Β· withdrawn
- Onshore wind project GEN-2014-058, Blaine CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2007-060, Blaine CountyOnshore wind Β· 202 MW Β· withdrawn
- Onshore wind project GEN-2014-061, Blaine CountyOnshore wind Β· 161 MW Β· withdrawn
- Onshore wind project GEN-2007-006, Blaine CountyOnshore wind Β· 160 MW Β· withdrawn
- Onshore wind project GEN-2014-003, Blaine CountyOnshore wind Β· 15.8 MW Β· withdrawn