πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

ONSHORE WIND Β· SPP

Onshore wind project GEN-2010-028, Blaine County

Onshore wind project GEN-2010-028, Blaine County is a 335 MW onshore wind request withdrawn in the SPP interconnection queue, in Blaine County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2010-028
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
TATONGA 345kV
Location
Blaine County, Oklahoma
Technology
Wind: 335 MW
Total requested
335 MW
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
20 May 2010
Proposed online date
December 2013

Location

Marker shows the centre of Blaine County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Blaine County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem