United States › Grid › Interconnection queues › Oklahoma
BATTERY STORAGE · SPPBattery storage project GEN-2023-161, Blaine County
Battery storage project GEN-2023-161, Blaine County is a 74.9 MW battery storage request in interconnection study in the SPP interconnection queue, in Blaine County, Oklahoma, connecting to OGE.
Queue statusIn planning
- PlanningQueued Oct 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2023-161
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Roman Nose 138 kV Substation
- Location
- Blaine County, Oklahoma
- Technology
- Battery: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 2 October 2023
- Proposed online date
- October 2027
Location
Marker shows the centre of Blaine County; the queue data does not give exact sites.
Other requests in Blaine County
- Onshore wind project GEN-2007-044, Blaine CountyOnshore wind · 299 MW · built
- Onshore wind project GEN-2010-028, Blaine CountyOnshore wind · 335 MW · withdrawn
- Onshore wind project GEN-2014-058, Blaine CountyOnshore wind · 300 MW · withdrawn
- Onshore wind project GEN-2007-060, Blaine CountyOnshore wind · 202 MW · withdrawn
- Onshore wind project GEN-2014-061, Blaine CountyOnshore wind · 161 MW · withdrawn
- Onshore wind project GEN-2007-006, Blaine CountyOnshore wind · 160 MW · withdrawn
- Battery storage project GEN-2021-002, Blaine CountyBattery storage · 100 MW · withdrawn
- Onshore wind project GEN-2014-003, Blaine CountyOnshore wind · 15.8 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem