ONSHORE WIND Β· SPPOnshore wind project GEN-2007-060, Blaine County
Onshore wind project GEN-2007-060, Blaine County is a 202 MW onshore wind request withdrawn in the SPP interconnection queue, in Blaine County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2007-060
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Location
- Blaine County, Oklahoma
- Technology
- Wind: 202 MW
- Total requested
- 202 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 18 December 2007
- Proposed online date
- December 2012
Location
Marker shows the centre of Blaine County; the queue data does not give exact sites.
Other requests in Blaine County
- Battery storage project GEN-2023-161, Blaine CountyBattery storage Β· 74.9 MW Β· in study
- Onshore wind project GEN-2007-044, Blaine CountyOnshore wind Β· 299 MW Β· built
- Onshore wind project GEN-2010-028, Blaine CountyOnshore wind Β· 335 MW Β· withdrawn
- Onshore wind project GEN-2014-058, Blaine CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2014-061, Blaine CountyOnshore wind Β· 161 MW Β· withdrawn
- Onshore wind project GEN-2007-006, Blaine CountyOnshore wind Β· 160 MW Β· withdrawn
- Battery storage project GEN-2021-002, Blaine CountyBattery storage Β· 100 MW Β· withdrawn
- Onshore wind project GEN-2014-003, Blaine CountyOnshore wind Β· 15.8 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem