United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

BATTERY STORAGE Β· SPP

Battery storage project GEN-2020-SR1, Beckham County

Battery storage project GEN-2020-SR1, Beckham County is a 40.0 MW battery storage request withdrawn in the SPP interconnection queue, in Beckham County, Oklahoma, connecting to WFEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingJun 2024 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2020-SR1
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WFEC
Connection point (POI)
Erick 138kV Substation
Location
Beckham County, Oklahoma
Technology
Battery: 40.0 MW
Total requested
40.0 MW
Service type
Energy only (ERIS)
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
4 August 2020
Proposed online date
June 2024
Came online
June 2024

Location

Marker shows the centre of Beckham County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Beckham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem