United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
BATTERY STORAGE Β· SPPBattery storage project GEN-2020-SR1, Beckham County
Battery storage project GEN-2020-SR1, Beckham County is a 40.0 MW battery storage request withdrawn in the SPP interconnection queue, in Beckham County, Oklahoma, connecting to WFEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingJun 2024 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2020-SR1
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- Erick 138kV Substation
- Location
- Beckham County, Oklahoma
- Technology
- Battery: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- TERMINATED
- Queue status
- Withdrawn
- Entered queue
- 4 August 2020
- Proposed online date
- June 2024
- Came online
- June 2024
Location
Marker shows the centre of Beckham County; the queue data does not give exact sites.
Other requests in Beckham County
- Solar project GEN-2024-154, Beckham CountySolar Β· 200 MW Β· in study
- Onshore wind project GEN-2006-035, Beckham CountyOnshore wind Β· 132 MW Β· built
- Onshore wind project GEN-2006-002, Beckham CountyOnshore wind Β· 101 MW Β· built
- Onshore wind project GEN-2006-043, Beckham CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project GEN-2011-049, Beckham CountyOnshore wind Β· 251 MW Β· withdrawn
- Solar project GEN-2021-010, Beckham CountySolar Β· 208 MW Β· withdrawn
- Solar project GEN-2021-014, Beckham CountySolar Β· 208 MW Β· withdrawn
- Battery storage project GEN-2021-012, Beckham CountyBattery storage Β· 203 MW Β· withdrawn
- Onshore wind project GEN-2015-071, Beckham CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2008-039, Beckham CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2009-070, Beckham CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2010-018, Beckham CountyOnshore wind Β· 101 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem