United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

BATTERY STORAGE Β· SPP

Battery storage project GEN-2020-SR3, Johnston County

Battery storage project GEN-2020-SR3, Johnston County is a 200 MW battery storage request withdrawn in the SPP interconnection queue, in Johnston County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingJun 2023 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2020-SR3
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Hugo-Sunnyside 345 kV
Location
Johnston County, Oklahoma
Technology
Battery: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
4 August 2020
Proposed online date
June 2023
Came online
June 2023

Location

Marker shows the centre of Johnston County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Johnston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem