Interconnection queue in Mississippi (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown173,970 MW
Active in queue3,970 MW17 requests
Agreement signed0.0 MW0 requests
Withdrawn6938 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

17 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Lakeover CCCT
Gas Β· Entergy Mississippi, LLC
820 MWIn study Hinds, MSMISO Aug 2025target 2028
Vicksburg CCCT
Gas Β· Entergy Mississippi, LLC
820 MWIn study Warren, MSMISO Aug 2025target 2027
Solar project J4121, Washington County
Solar
300 MWIn study Washington, MSMISO Sep 2025target 2030
Battery storage project J4119, Rankin County
Battery storage
200 MWIn study Rankin, MSMISO Sep 2025target 2029
Solar project J4073, Coahoma County
Solar
200 MWIn study Coahoma, MSMISO Sep 2025target 2029
Solar project J4189, Sunflower County
Solar
200 MWIn study Sunflower, MSMISO Oct 2025target 2030
Battery storage project J4154, Madison County
Battery storage
200 MWIn study Madison, MSMISO Oct 2025target 2028
Battery storage project 25RSC-013, Lowndes County
Battery storage
200 MWIn study Lowndes, MSSoutheast Aug 2025target 2031
Battery storage project S1127, Washington County
Battery storage
170 MWIn study Washington, MSMISO Nov 2025target 2027
Solar project 25-IC-1355, Jasper County
Solar
165 MWIn study Jasper, MSSoutheast Apr 2025target 2029
Battery storage project J4083, Perry County
Battery storage
150 MWIn study Perry, MSMISO Oct 2025target 2030
Solar project J2685, Sharkey County
Solar
120 MWIn study Sharkey, MSMISO Aug 2025target 2026
Solar + storage project 25-IC-1337, Wayne County
Solar + storage
100 MWIn study Wayne, MSSoutheast Apr 2025target 2028
Battery storage project J4131, Scott County
Battery storage
100 MWIn study Scott, MSMISO Oct 2025target 2030
Solar project J4046, Attala County
Solar
100 MWIn study Attala, MSMISO Jul 2025target 2030
Surplus; J908
Battery storage
100 MWIn study Tallahatchie, MSMISO Aug 2025target 2027
Gas project 25-IC-1316, Kemper County
Gas
25.0 MWIn study Kemper, MSSoutheast Apr 2025target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)