United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Mississippi (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown122,059 MW
Active in queue459 MW3 requests
Agreement signed0.0 MW0 requests
Withdrawn122,059 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 396, Desoto County
Gas
593 MWWithdrawn / abandoned Desoto, MSSoutheast Aug 2019
Gas project 397, Desoto County
Gas
474 MWWithdrawn / abandoned Desoto, MSSoutheast Aug 2019
Solar project 390, Tallahatchie County
Solar
200 MWWithdrawn / abandoned Tallahatchie, MSSoutheast Jun 2019
Solar project 368, Chickasaw County
Solar
175 MWWithdrawn / abandoned Chickasaw, MSSoutheast Apr 2019
Onshore wind project J1404, Sunflower County
Onshore wind
167 MWWithdrawn / abandoned Sunflower, MSMISO Apr 2019target 2022
Solar project J1223, Pike County
Solar
150 MWWithdrawn / abandoned Pike, MSMISO Apr 2019target 2023
Solar project 274, Lowndes County
Solar
74.0 MWWithdrawn / abandoned Lowndes, MSSoutheast Jun 2019
Solar project 391, Tallahatchie County
Solar
66.0 MWWithdrawn / abandoned Tallahatchie, MSSoutheast Jun 2019
Battery storage project J1259, Pike County
Battery storage
50.0 MWWithdrawn / abandoned Pike, MSMISO Apr 2019target 2022
Solar project J1287, Tunica County
Solar
50.0 MWWithdrawn / abandoned Tunica, MSMISO Apr 2019target 2022
Battery storage project J1439, Tunica County
Battery storage
40.0 MWWithdrawn / abandoned Tunica, MSMISO Apr 2019target 2022
Solar project 400, Lowndes County
Solar
20.0 MWWithdrawn / abandoned Lowndes, MSSoutheast Mar 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)