United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
BATTERY STORAGE Β· MISOBattery storage project J1439, Tunica County
Battery storage project J1439, Tunica County is a 40.0 MW battery storage request withdrawn in the MISO interconnection queue, in Tunica County, Mississippi, connecting to ENTERGY MISSISSIPPI.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedAug 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1439
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI
- Connection point (POI)
- Lula - Tunica 115 kV Line
- Location
- Tunica County, Mississippi
- Technology
- Battery: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA Complete; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- October 2022
- Withdrawn
- August 2020
Location
Marker shows the centre of Tunica County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Tunica County
- Onshore wind project J866, Tunica CountyOnshore wind Β· 200 MW Β· under construction
- Solar project J1440, Tunica CountySolar Β· 160 MW Β· under construction
- Onshore wind project J2571, Tunica CountyOnshore wind Β· 177 MW Β· in study
- Solar project J3175, Tunica CountySolar Β· 160 MW Β· in study
- Solar project J2174, Tunica CountySolar Β· 390 MW Β· withdrawn
- Solar project J3261, Tunica CountySolar Β· 200 MW Β· withdrawn
- Solar project J2939, Tunica CountySolar Β· 150 MW Β· withdrawn
- Solar project J2432, Tunica CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project J2857, Tunica CountySolar + storage Β· 150 MW Β· withdrawn
- Battery storage project J2015, Tunica CountyBattery storage Β· 90.0 MW Β· withdrawn
- Battery storage project J3177, Tunica CountyBattery storage Β· 80.0 MW Β· withdrawn
- Solar project J1287, Tunica CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem