BATTERY STORAGE Β· MISO

Battery storage project J2015, Tunica County

Battery storage project J2015, Tunica County is a 90.0 MW battery storage request withdrawn in the MISO interconnection queue, in Tunica County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2015
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY MISSISSIPPI, LLC.
Connection point (POI)
Lula-Tunica (same POI as J1440)
Location
Tunica County, Mississippi
Technology
Battery: 90.0 MW
Total requested
90.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
26 August 2021
Proposed online date
October 2025
Withdrawn
October 2023

Location

Marker shows the centre of Tunica County; the queue data does not give exact sites.