United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

BATTERY STORAGE Β· MISO

Battery storage project J3177, Tunica County

Battery storage project J3177, Tunica County is a 80.0 MW battery storage request withdrawn in the MISO interconnection queue, in Tunica County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedMar 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3177
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY MISSISSIPPI, LLC.
Connection point (POI)
Robinsonville 230kV Substation
Location
Tunica County, Mississippi
Technology
Battery: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
14 September 2022
Proposed online date
October 2026
Withdrawn
March 2023

Location

Marker shows the centre of Tunica County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Tunica County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem