United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
BATTERY STORAGE Β· MISOBattery storage project J1259, Pike County
Battery storage project J1259, Pike County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Pike County, Mississippi, connecting to ENTERGY MISSISSIPPI.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedAug 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1259
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI
- Connection point (POI)
- Colonial Pipeline - Kentwood 115 kV Line
- Location
- Pike County, Mississippi
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA Complete; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- October 2022
- Withdrawn
- August 2020
Location
Marker shows the centre of Pike County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Pike County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem