Battery storage project J1259, Pike County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Pike County, Mississippi, connecting to ENTERGY MISSISSIPPI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedAug 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1259
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY MISSISSIPPI
Connection point (POI)
Colonial Pipeline - Kentwood 115 kV Line
Location
Pike County, Mississippi
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA Complete; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
29 April 2019
Proposed online date
October 2022
Withdrawn
August 2020

Location

Marker shows the centre of Pike County; the queue data does not give exact sites.