SOLAR Β· MISOSolar project J1223, Pike County
Solar project J1223, Pike County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Pike County, Mississippi, connecting to ENTERGY MISSISSIPPI.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1223
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI
- Connection point (POI)
- Colonial Pipeline - Kentwood 115 kV Line
- Location
- Pike County, Mississippi
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA Complete; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 27 April 2019
- Proposed online date
- October 2023
- Withdrawn
- March 2021
Location
Marker shows the centre of Pike County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Pike County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem