United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· SOUTHEASTSolar project 391, Tallahatchie County
Solar project 391, Tallahatchie County is a 66.0 MW solar request withdrawn in the Southeast interconnection queue, in Tallahatchie County, Mississippi, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 391
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Tallahatchie County, Mississippi
- Technology
- Solar: 66.0 MW
- Total requested
- 66.0 MW
- Queue status
- Withdrawn
- Entered queue
- 3 June 2019
Location
Marker shows the centre of Tallahatchie County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Tallahatchie County
- Solar project J908, Tallahatchie CountySolar Β· 100 MW Β· under construction
- Surplus; J908Battery storage Β· 100 MW Β· in study
- Onshore wind project J2964, Tallahatchie CountyOnshore wind Β· 220 MW Β· withdrawn
- Onshore wind project J4064, Tallahatchie CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project 390, Tallahatchie CountySolar Β· 200 MW Β· withdrawn
- Solar project J2391, Tallahatchie CountySolar Β· 100 MW Β· withdrawn
- Solar project J2182, Tallahatchie CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem