United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

ONSHORE WIND Β· MISO

Onshore wind project J4064, Tallahatchie County

Onshore wind project J4064, Tallahatchie County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Tallahatchie County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J4064
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY MISSISSIPPI, LLC.
Connection point (POI)
WEBB
Location
Tallahatchie County, Mississippi
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
4 September 2025
Proposed online date
October 2030
Withdrawn
December 2025

Location

Marker shows the centre of Tallahatchie County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Tallahatchie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem