πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Maryland (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,012 MW
Active in queue1,012 MW7 requests
Agreement signed1,012 MW7 requests
Withdrawn341,377 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Fourth Quarter
Battery storage Β· Fourth Quarter BESS, LLC
500 MWAgreement signed Montgomery, MDPJM Oct 2020target 2030
Jade Meadow III Solar Facility
Solar + storage
300 MWAgreement signed Garrett, MDPJM Sep 2020target 2028
CPV Backbone Solar
Solar
175 MWAgreement signed Garrett, MDPJM Mar 2020target 2025
Frosty Valley Energy Center
Solar
20.0 MWAgreement signed Anne Arundel, MDPJM Mar 2020target 2027
SBC Solar
Solar + storage
10.0 MWAgreement signed Dorchester, MDPJM Mar 2020target 2027
RHC Solar
Solar + storage
3.9 MWAgreement signed Somerset, MDPJM Apr 2020target 2024
GGC Solar
Solar + storage
2.7 MWAgreement signed Dorchester, MDPJM Mar 2020target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)