Withdrawn queue requests in Maine (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown27960 MW
Active in queue180 MW1 requests
Agreement signed0.0 MW0 requests
Withdrawn27960 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

27 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar
Solar
218 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2023target 2028
Wind
Onshore wind
217 MWWithdrawn / abandoned Aroostook, MEISO-NE Mar 2023target 2026
Wind
Onshore wind
197 MWWithdrawn / abandoned Aroostook, MEISO-NE Aug 2023target 2028
Solar and Battery
Solar + storage
139 MWWithdrawn / abandoned Penobscot, MEISO-NE Apr 2023target 2028
Solar
Solar
51.5 MWWithdrawn / abandoned Somerset, MEISO-NE Sep 2023target 2027
Winslow-County Rd Lakewood 115 kV SS - Winslow-County Rd-Lakewood 2 DG Study
Solar
21.0 MWWithdrawn / abandoned Kennebec, MEISO-NE Dec 2023target 2024
Augusta E/Puddledock/Bowman St 115 kV SS - Midcoast Area DG Study
Solar + storage
18.6 MWWithdrawn / abandoned Kennebec, MEISO-NE Dec 2023target 2024
Solar
Solar
15.6 MWWithdrawn / abandoned York, MEISO-NE Oct 2023target 2024
Newcastle 115 kV SS - Midcoast Area DG Study
Solar
11.6 MWWithdrawn / abandoned Cumberland, MEISO-NE Oct 2023target 2024
Raymond 115 kV SS - Raymond Area DG Study
Solar
9.9 MWWithdrawn / abandoned Cumberland, MEISO-NE Sep 2023target 2025
Leeds 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study
Solar
5.0 MWWithdrawn / abandoned Androscoggin, MEISO-NE Sep 2023target 2024
CMP Spring St 115 kV SS - Greater Portland Area DG Study
Solar
5.0 MWWithdrawn / abandoned Cumberland, MEISO-NE Dec 2023target 2024
Sturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study
Solar
5.0 MWWithdrawn / abandoned Franklin, MEISO-NE Sep 2023target 2024
CMP Elm St 115 kV SS - Greater Portland Area DG Study
Solar
5.0 MWWithdrawn / abandoned Cumberland, MEISO-NE Dec 2023target 2024
CMP Biddeford IP 115 kV SS - Louden-Biddeford Area DG Study
Solar
4.9 MWWithdrawn / abandoned York, MEISO-NE Dec 2023target 2024
Lincolnville 115 kV SS - Midcoast Area DG Study
Solar
4.9 MWWithdrawn / abandoned Lincoln, MEISO-NE Oct 2023target 2024
CMP West Buxton 115 kV SS - Louden-Biddeford Area DG Study
Solar
4.5 MWWithdrawn / abandoned York, MEISO-NE Dec 2023target 2024
CMP Moshers/Prides Corner 115 kV SS - Greater Portland Area DG Study
Other
4.0 MWWithdrawn / abandoned Cumberland, MEISO-NE Dec 2023target 2024
Mason 115 kV SS - Midcoast Area DG Study
Solar
3.9 MWWithdrawn / abandoned Lincoln, MEISO-NE Oct 2023target 2024
Bath 115 kV SS - Midcoast Area DG Study
Solar
3.4 MWWithdrawn / abandoned Lincoln, MEISO-NE Oct 2023target 2024
Coopers Mills 115 kV SS - Midcoast Area DG Study
Solar
2.9 MWWithdrawn / abandoned Lincoln, MEISO-NE Oct 2023target 2024
CMP Vallee Lane 115 kV SS - Louden-Biddeford Area DG Study
Solar
2.0 MWWithdrawn / abandoned Cumberland, MEISO-NE Dec 2023target 2024
Athens 115 kV SS - CMP Wyman Area Study
Solar
2.0 MWWithdrawn / abandoned Somerset, MEISO-NE Mar 2023target 2024
Ludden Lane 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study
Solar
2.0 MWWithdrawn / abandoned Oxford, MEISO-NE Sep 2023target 2024
Topsham 115 kV SS - Midcoast Area DG Study
Solar
2.0 MWWithdrawn / abandoned Waldo, MEISO-NE Oct 2023target 2024
Highland/Park St 115 kV SS - Midcoast Area DG Study
Solar
2.0 MWWithdrawn / abandoned Knox, MEISO-NE Oct 2023target 2024
Woodstock 115 kV SS - Roxbury-Rumford-Woodstock Area DG Study
Solar
1.6 MWWithdrawn / abandoned Oxford, MEISO-NE Sep 2023target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)