πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Maine (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11387 MW
Active in queue417 MW6 requests
Agreement signed417 MW6 requests
Withdrawn11387 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar
Solar
103 MWWithdrawn / abandoned Somerset, MEISO-NE Apr 2021target 2024
Solar
Solar
72.0 MWWithdrawn / abandoned Somerset, MEISO-NE Apr 2021target 2024
Solar
Solar
51.4 MWWithdrawn / abandoned Hancock, MEISO-NE Feb 2021target 2024
Swain Solar
Solar
40.4 MWWithdrawn / abandoned Oxford, MEISO-NE Jul 2021target 2027
Solar
Solar
31.4 MWWithdrawn / abandoned Knox, MEISO-NE Feb 2021target 2024
CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study
Solar
28.7 MWWithdrawn / abandoned Somerset, MEISO-NE Feb 2021target 2024
Solar
Solar
20.7 MWWithdrawn / abandoned Hancock, MEISO-NE Jul 2021target 2024
CMP Winslow 115 kV SS - Winslow-Lakewood Areas Study
Solar + storage
18.7 MWWithdrawn / abandoned Somerset, MEISO-NE Feb 2021target 2024
Offshore Wind
Offshore wind
11.6 MWWithdrawn / abandoned MEISO-NE Jul 2021target 2023
CMP County Road 115 kV SS - Winslow-Lakewood Areas Study
Solar + storage
7.8 MWWithdrawn / abandoned Kennebec, MEISO-NE Feb 2021target 2024
Solar
Solar
1.0 MWWithdrawn / abandoned Hancock, MEISO-NE Oct 2021target 2023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)