United States βΊ Grid βΊ Interconnection queues βΊ Maine
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Maine (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
103 MW | Withdrawn / abandoned |
| Solar Solar |
72.0 MW | Withdrawn / abandoned |
| Solar Solar |
51.4 MW | Withdrawn / abandoned |
| Swain Solar Solar |
40.4 MW | Withdrawn / abandoned |
| Solar Solar |
31.4 MW | Withdrawn / abandoned |
| CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study Solar |
28.7 MW | Withdrawn / abandoned |
| Solar Solar |
20.7 MW | Withdrawn / abandoned |
| CMP Winslow 115 kV SS - Winslow-Lakewood Areas Study Solar + storage |
18.7 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
11.6 MW | Withdrawn / abandoned |
| CMP County Road 115 kV SS - Winslow-Lakewood Areas Study Solar + storage |
7.8 MW | Withdrawn / abandoned |
| Solar Solar |
1.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)