United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Kentucky
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project 243, Muhlenberg County Gas |
1,184 MW | |
| Gas project G019, Oldham County Gas |
750 MW | |
| Coal project G218, Trimble County Coal |
750 MW | |
| Other project 55, Marshall County Other |
640 MW | |
| Gas project LGE-GIS-2009-001, Mccraken County Gas |
123 MW | |
| Hydro project G032, Hancock County Hydro |
95.0 MW | |
| Hydro project G848, Livingston County Hydro |
80.0 MW | |
| Bluebird Solar Solar |
80.0 MW | |
| Turkey Creek Solar Solar |
50.0 MW | |
| Other project 24, Muhlenberg County Other |
48.0 MW | |
| Other project 22, Muhlenberg County Other |
41.0 MW | |
| Other project 23, Muhlenberg County Other |
41.0 MW | |
| Glover Creek Solar Solar |
35.0 MW | |
| Big Sandy #1 Gas |
20.0 MW | |
| Bluebird Solar Solar |
20.0 MW | |
| Glover Creek Solar Solar |
20.0 MW | |
| Riverside Generating Stations Gas |
20.0 MW | |
| Big Sandy #1 Gas |
17.0 MW | |
| Big Sandy #1 Gas |
13.0 MW | |
| Riverside Generating Station Gas |
6.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)6 Β· 2,077 MW
- MISO (Midcontinent)4 Β· 1,675 MW
- PJM (Mid-Atlantic, Midwest)10 Β· 281 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)