GAS · PJMRiverside Generating Station
Riverside Generating Station is a 6.0 MW gas request built and operating in the PJM interconnection queue, in Lawrence County, Kentucky, connecting to AEP.
Request details
- Queue ID
- Y2-045
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Baker 345kV
- Location
- Lawrence County, Kentucky
- Technology
- Gas: 6.0 MW
- Total requested
- 6.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 2 August 2012
- Proposed online date
- July 2015
- Came online
- January 2016
Location
Marker shows the centre of Lawrence County; the queue data does not give exact sites.
Other requests in Lawrence County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem