United States βΊ Grid βΊ Interconnection queues βΊ Indiana
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Indiana (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project LGE-GIS-2021-008, Clark County Solar + storage |
500 MW | Paused / redesign |
| Solar project J2270, Sullivan County Solar |
300 MW | In study |
| Replace 250MW of the existing Petersburg coal unit with PV and DC-coupled battery storage; Petersburg 2 Solar + storage |
250 MW | In study |
| Solar + storage project AH2-025, Fountain County Solar + storage |
200 MW | In study |
| Solar project J1724, Laporte County Solar |
150 MW | In study |
| Battery storage project J2178, Sullivan County Battery storage |
100 MW | In study |
| Battery storage project J2232, Tipton County Battery storage |
100 MW | In study |
| Solar project J2177, Tipton County Solar |
67.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)6 Β· 967 MW
- Southeast (non-ISO utilities)1 Β· 500 MW
- PJM (Mid-Atlantic, Midwest)1 Β· 200 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)