United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Other interconnection queue in Illinois

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown82,142 MW
Active in queue2,142 MW8 requests
Agreement signed0.0 MW0 requests
Withdrawn345,326 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Other project J2694, Christian County
Other
500 MWIn study Christian, ILMISO Sep 2022target 2027
Other project J2171, Perry County
Other
500 MWIn study Perry, ILMISO Mar 2022target 2024
Surplus; Glacier Moraine
Other
360 MWIn study Cumberland, ILMISO Jul 2024target 2027
Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3
Other
322 MWIn study Peoria, ILMISO Jul 2024target 2025
Surplus; Shelby
Other
150 MWIn study Cumberland, ILMISO Jun 2024target 2026
Surplus; J33/J734
Other
135 MWIn study Ford, ILMISO May 2023target 2026
Surplus; J734
Other
135 MWIn study Mclean, ILMISO Dec 2022target 2026
Surplus; J1102
Other
40.0 MWIn study Logan, ILMISO Oct 2023target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)