United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Florida (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5374 MW
Active in queue374 MW5 requests
Agreement signed0.0 MW0 requests
Withdrawn332,274 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 259, Highlands County
Solar Β· Placid Solar II, LLC
74.9 MWUnder construction Highlands, FLSoutheast May 2019target 2023
Solar project 258, Highlands County
Solar Β· Placid Solar, LLC
74.9 MWUnder construction Highlands, FLSoutheast May 2019target 2023
Solar project 273, Polk County
Solar Β· FL Solar 10, LLC
74.9 MWUnder construction Polk, FLSoutheast Dec 2019target 2022
Solar project 269, Marion County
Solar Β· Solar FL 2018 LLC
74.9 MWIn study Marion, FLSoutheast Sep 2019target 2021
Solar project 376, Baker County
Solar Β· FPL
74.5 MWIn study Baker, FLSoutheast Nov 2019target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)