United States βΊ Grid βΊ Interconnection queues βΊ Florida
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Florida (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 202.1, Levy County Solar Β· FL SB 9, LLC |
74.9 MW | Under construction |
| Solar project 276, Union County Solar Β· FPL |
74.5 MW | In study |
| Solar project 20 Solar |
74.5 MW | Paused / redesign |
| Solar project 306, Brevard County Solar Β· FPL |
74.5 MW | In study |
| Solar project 280, Hendry County Solar Β· FPL |
74.5 MW | In study |
| Solar project 289, Miami-Dade County Solar Β· FPL |
74.5 MW | In study |
| Solar project 193, Levy County Solar Β· Origis Development LLC |
70.0 MW | In study |
| Solar project JEA-Q007-PV, Duval County Solar |
50.0 MW | Agreement signed |
| Solar project JEA-Q005-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar project JEA-Q006-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar project JEA-Q004-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar project JEA-Q003-PV, Duval County Solar |
50.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)