United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 20
Solar project 20 is a 74.5 MW solar request suspended in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.
Queue statusPaused / redesign
- PlanningQueued Oct 2017 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2019 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 20
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Seminole Electric Cooperative
- Connection point (POI)
- Riverview/ Florahome 230 kV
- Location
- Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- NRIS and ERIS
- Study phase
- Study Phase: Facilities; Status: Study Complete IA Executed IA Suspended - 3/29/2021 IA Termination - 3/30/2024
- Queue status
- Suspended
- Entered queue
- 9 October 2017
- Proposed online date
- July 2019
Location
No county location in the queue data.