United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

SOLAR Β· SOUTHEAST

Solar project 20

Solar project 20 is a 74.5 MW solar request suspended in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusPaused / redesign
  1. PlanningQueued Oct 2017 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jul 2019 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
20
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
Riverview/ Florahome 230 kV
Location
Florida
Technology
Solar: 74.5 MW
Total requested
74.5 MW
Service type
NRIS and ERIS
Study phase
Study Phase: Facilities; Status: Study Complete IA Executed IA Suspended - 3/29/2021 IA Termination - 3/30/2024
Queue status
Suspended
Entered queue
9 October 2017
Proposed online date
July 2019

Location

No county location in the queue data.

Power plants in Florida Β· Transmission lines in Florida

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem