United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Florida

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7860 MW
Active in queue24.3 GW251 requests
Agreement signed860 MW7 requests
Withdrawn47276.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Bull Creek (Osceola Generating Station)
Gas
555 MWAgreement signed Osceola, FLSoutheast Sep 2021target 2025
Solar + storage project 425A, Jackson County
Solar + storage Β· Third Party
75.0 MWAgreement signed Jackson, FLSoutheast Feb 2022target 2029
Solar + storage project 425, Bradford County
Solar + storage Β· Third Party
74.9 MWAgreement signed Bradford, FLSoutheast Aug 2021target 2028
Solar project 76, Polk County
Solar
55.0 MWAgreement signed Polk, FLSoutheast Nov 2020target 2023
Solar project JEA-Q007-PV, Duval County
Solar
50.0 MWAgreement signed Duval, FLSoutheast Dec 2017target 2026
Other project 70, Polk County
Other
48.0 MWAgreement signed Polk, FLSoutheast May 2020target 2021
Solar project 11
Solar
2.0 MWAgreement signed FLSoutheast Aug 2015target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)