United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 11
Solar project 11 is a 2.0 MW solar request with a signed interconnection agreement in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.
Queue statusConsented
- PlanningQueued Aug 2015 (completed)
- ConsentedMar 2017 (current stage)
- Construction (not yet reached)
- OperatingTarget May 2016 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 11
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Seminole Electric Cooperative
- Connection point (POI)
- Federal
- Location
- Florida
- Technology
- Solar: 2.0 MW
- Total requested
- 2.0 MW
- Study phase
- Study Phase: System Impact/Facilities; Status: Studies Complete Executed IA on 03/24/2017
- Queue status
- Active
- Entered queue
- 11 August 2015
- Agreement signed
- 24 March 2017
- Proposed online date
- May 2016
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem