Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown13653.2 GW
Active in queue53.2 GW136 requests
Agreement signed31.6 GW64 requests
Withdrawn21574.6 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

136 requests ยท page 1 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
Darden
Solar + storage
2,365 MWAgreement signed Fresno, CACAISO Apr 2021target 2028
Umbriel
Solar + storage
2,365 MWAgreement signed Imperial, CACAISO Apr 2021target 2035
Wingtip Solar 1
Solar + storage
2,352 MWAgreement signed Merced, CACAISO Apr 2021target 2032
Holman
Wind + storage
2,282 MWAgreement signed Monterey, CACAISO Apr 2021target 2034
Plum
Solar + storage
1,560 MWIn study Kings, CACAISO Apr 2021target 2031
Euismod
Solar + storage
1,247 MWAgreement signed Kern, CACAISO Apr 2021target 2028
Sunbaked Solar
Solar + storage
1,024 MWAgreement signed Inyo, CACAISO Apr 2021target 2029
Easley
Solar + storage
940 MWAgreement signed Riverside, CACAISO Apr 2021target 2028
Invictus
Solar + storage
860 MWIn study Riverside, CACAISO Apr 2021target 2029
Artemis
Solar + storage
825 MWIn study Kern, CACAISO Apr 2021target 2029
Valley Sunlight Refinery
Solar + storage
821 MWIn study Kings, CACAISO Apr 2021target 2032
Solsken
Solar + storage
809 MWIn study Tulare, CACAISO Apr 2021target 2033
Buttonbush Solar 2
Solar + storage
716 MWAgreement signed Kern, CACAISO Apr 2021target 2032
Presidio
Solar + storage
713 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2030
Yuha Desert Battery Storage
Battery storage
633 MWIn study Imperial, CACAISO Apr 2021target 2031
Cady Solar
Solar + storage
626 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Cherry Lane Hybrid
Solar + storage
621 MWIn study Kern, CACAISO Apr 2021target 2031
Australis
Solar + storage
614 MWAgreement signed Merced, CACAISO Apr 2021target 2031
Cornucopia Hybrid
Solar + storage
605 MWAgreement signed Fresno, CACAISO Apr 2021target 2030
Soleil Cantil
Solar + storage
597 MWIn study Kern, CACAISO Apr 2021target 2033
Solar + storage project Q80, Kern County
Solar + storage
590 MWIn study Kern, CAWest Apr 2021target 2024
Twin Palms Solar
Solar + storage
576 MWAgreement signed Riverside, CACAISO Apr 2021target 2030
Redonda
Solar + storage
542 MWAgreement signed Riverside, CACAISO Apr 2021target 2031
Sagebrush Energy Storage
Battery storage
528 MWIn study Kern, CACAISO Apr 2021target 2033
Alta Casa Storage
Battery storage
515 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Greasewood Energy Storage
Battery storage
513 MWAgreement signed Kern, CACAISO Apr 2021target 2033
Conduit Energy Storage
Battery storage
513 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Rosa Storage
Battery storage
512 MWIn study Ventura, CACAISO Apr 2021target 2034
Lock Storage
Battery storage
508 MWAgreement signed Fresno, CACAISO Apr 2021target 2027
Drifter Energy Storage
Battery storage
505 MWAgreement signed Ventura, CACAISO Apr 2021target 2033
Spectrum Energy Storage
Battery storage
504 MWAgreement signed Alameda, CACAISO Apr 2021target 2032
Delilah Energy Storage
Battery storage
504 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Battery storage project Q84, San Bernardino County
Battery storage
500 MWIn study San Bernardino, CAWest Oct 2021target 2024
Corby 2
Battery storage
476 MWIn study Solano, CACAISO Apr 2021target 2031
Mineral King Solar
Solar + storage
430 MWIn study Tulare, CACAISO Apr 2021target 2029
Boulder Brush Hybrid
Wind + storage
420 MWIn study San Diego, CACAISO Apr 2021target 2031
Tolenas
Battery storage
417 MWIn study Solano, CACAISO Apr 2021target 2031
Elysian
Solar + storage
412 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Dos Palmas
Battery storage
411 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Hidalgo Energy Storage
Battery storage
408 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2033
Clarkson
Solar + storage
408 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Lotus Solar 2
Solar + storage
406 MWIn study Madera, CACAISO Apr 2021target 2030
Simon
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Gabriel Storage
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2033
Trolley
Battery storage
406 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Coral Reef
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Fleetwood
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Marici
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Brushy
Battery storage
400 MWIn study Solano, CACAISO Apr 2021target 2031
Page 1 of 3

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)